CHP Govora, Unit 7
Retrofit with Efficiency Increase of Electrostativ Rrecipitator (ESP) > Flue Gas Treatment
![](assets/images/8/steinmueller_engineering_references_projects_map_location_4_govora-87ef2dbd.jpg)
Legende
Ausgewählte Referenzen von Steinmüller Engineering
Erfolge
Dust: < 50 mg/m3 (originally 180 mg/m3)
(STP @ 6% O2)
Fuel: Romanian Lignite (a.r.)
LCV: 6,7 - 6,3 MJ/kg (1,6-2,0 Mcal/kg)
w: 34-43 %
a: 15-32 %
S: 0,9-1,5 %
Boiler design: 420 t/h, 2-pass boiler
Umfang des Angebots
- Flow cross-section enlarged by introducing new roof design
- Flow distribution improved by installing guide vanes
- Mechanically more robust electrodes installed
- High voltage system replaced